B-13 RAIL

Code: N/A

It is installed on the weapon and forms the Picatinny rail , which does not overlap the line of the mechanical sight.

Kit type: Basic

13,200.000

In Stock

Description

The  “B-13” rail above the receiver is an all-milled product made of D16T alloy with a black coating or desert color.

It is installed on the side tide (“dovetail”) of the weapon and forms the Picatini bar, which does not overlap the line of the mechanical sight.

The “B-13” rail is mounted on the standard side tide (“dovetail”) base located on the AK 103, 104, 105, 74M, 74C, AKMS, AKM, Saiga MK, Saiga MK-03, Saiga 410 carbines and provides installation on the weapon of sighting devices.

Forms Picatinny rail over the receiver of a weapon.

Allows you to install on weapons as individual optical sights, as well as a combination of devices.

Operational Benefits:

  •  light weight and durability
  •   the ability to quickly install on and remove weapons
  •   the possibility of double fixation on a regular basis “Dovetail”
  •   when installed on a weapon does not close the standard sighting device

Weight: 175 ± 5 g

Overall dimensions: (88х45х200) ± 5 mm

Picatinny rail length: 200 ± 5 mm

Operating temperature range: from -50 ° C to + 50 ° C

Warranty period of storage and operation: 60 months.

In the kit:

  • “B-13” rail above the  receiver         1 pc
  • Allen key                                          2 pcs
  • Operation manual                            1pc

To install on a weapon you need:

1. Set the bracket lock lever to the “open” position.
2. Loosen the locking screws located on the lever with an Allen key.
3. Put the “B-13” on the side bar of the receiver of the weapon, shifting the “B-13” from the stock to the barrel.
4. Turn the lever-retainer bracket to the “closed” position, and then check the fixation of the bracket on the side plate of the receiver.
5. If, after turning the lever-retainer of the bracket to the “closed” position, the “B-13” is not fixed or is not fixed firmly on the side rail of the receiver, the following steps must be performed:

  • move the lever to the “open” position,
  •  loosen the locking screw located on the lever with an Allen key,
  •  screw inside the lever with another key to achieve the moment of the start of fixing “B-13” on the side plate of the receiver and tighten the lock screw with a key,
  •  turn the locking lever to the closed position.

Additional information

Weight 200 g
Color

Black, Desert, Golden khaki